In our Composite Decking Sheet the floor is constituted by a profiled Deck sheet made of metal onto which a layer of concrete is poured. The GI decking sheet is attached to the concrete by method for mouldings on the sheet which prevent the cement from slipping on a level plane and disconnecting vertically. At the point when the concrete is spilled and until it has arrived at a proper level of solidifying, the weights of the concrete, staff working and supplies utilized as a part of borne by the sheet alone. When the cement has solidified the sheet and the concrete structure a bound together bond.
Permanent Formwork Profile Range
We manufacture profiles which are used as permanent formwork. Permanent formwork remains it situ for the life of the building but, unlike composite flooring profiles, it does not Act as reinforcement in the concrete slab.
Base Metal
Base Metal | High Tensile Structural Grade Steel 240 / 345mpa / 550 |
Coating Mass | 120, 180, & 275 GSM |
Thickness | 0.8mm to 2mm |
Coating Standard | Galvanised Steel as per IS : 277 |
Type | Bare, Primer Coated, Galvanised, Pre Painted |
Length | 12000mm |